Transport Watch UK Focusing on UK's Traffic & Traffic Systems

DELAYS 5 DAYS COMMENCING MONDAY 27th NOVEMBER 2006

Friday 1st December 2006

 

 

Penryn (Cornwall)

Trees on the line

5 hours 30 minutes

South East England

Slippery rails

8 hours 30 minutes

Ashburys (Manchester)

Broken down train

3 hours 30 minutes

 

 

 

Thursday 30th November

 

 

Bristol area

Obstruction on the line

2 hours 8 minutes

London Victoria

Broken down train

2 hours

Maidenhead

Broken down train

2 hours 53 minutes

South London

Slippery rails

2 hours 47 minutes

Teddington

Over-running engineering work

2 hours

Malvern Link

Bridge strike

11 hours

Chichester/Barnham area

Fatality

2 hours

Wednesday 29th November

 

 

Luton

Signalling problems

In excess of 8 hours

Elsenham

Overhead wire problems

19 hours

Tuesday 28th November

 

 

Wakefield Kirkgate

Signalling problems

5 hours 30 minutes

Glasgow – Wemyss Bay route

Signalling problems

2 hours 15 minutes

Pewsey

Derailed engineers train

Approx 24 hours

Bromsgrove

Fatality

2 hours 25 minutes

Chinley

Broken down freight train

2 hours 30 minutes

Portsmouth area

Electrical supply problems

3 hours 35 minutes

Southern England

Slippery rails

3 hours 28 minutes

Brookwood                                 

Landslip

2 hours 25 minutes

Aberystwyth

Trees on the line

5 hours 10 minutes

Monday 27th November

 

 

Mill Hill Broadway

Over-running engineering works

3 hours 55 minutes

Barnes

Over-running engineering works

7 hours 51 minutes

Frimley

Emergency engineering works

2 hours 47 minutes

Swinton

Signalling problems

3 hours 3 minutes

Swindon

Signalling problems

2 hours 55 minutes

London Bridge

Signalling problems

3 hours 19 minutes

Return to train delays...


© Transport Watch UK 2003

Designed by: 1PCS.co.uk